Every change on every job, caught early and on the record.

$95Bdisputed across construction projects in one yearHKA CRUX Insight, 2025
33%of contract budgets tied up in disputed costArcadis
44%of projects finish at a lossAkanbi et al., 2019

Spot issues as they rise.

A change shows up in an owner email, a site photo or a foreman's voice memo long before anyone opens a form. Pillarix reads each one as it lands and flags the changes with their source, a first read on impact and the notice deadline.

Dana WhitfieldOwner’s representative
RE: Sta. 42+00, unsuitable material, direction to proceed

Further to our site meeting of 26 August, please proceed with excavation and off-site disposal of the affected material at Sta. 42+00 to 48+50. The Owner considers this within the existing scope of work. Confirm your programme impact within 5 business days.

Site meeting minutes, 26 Aug.pdfGeotech log BH-14.pdfPhoto log 42+00.zip
Impact
$4.2M8,400 t × $312/t, rate from BH-14 p.4Show evidence
+18 days650 m at planned output, response due 4 SepShow evidence
In 4 daysTime-barred under GC 8.2, 10 business days from 26 AugShow evidence
Route toScope Analysis

A written direction asserting the work is in scope. Scope Analysis tests it against the contract and the geotechnical baseline, and already holds an open claim on this chainage.

ArchiveRun Scope Analysis

A paper trail that holds up.

Every change links to its source document, its location on the drawing, and who decided what and when. When a question comes months later, the answer is in the record.

Claim fileCE-011 Sink relocation at Play/Nap 8
29 Jun6 Jul13 Jul20 Jul
Millwork, Play/Nap 8
Plumbing rough-in
Casework install
PhotoInstructionNotice
PlannedAs builtDelay claimed
  1. 1
    The owner moved the sink to the north wall on 7 July without reissuing the drawing.Email, R. Iwasaki, 7 JulA-201 Rev 3
  2. 2
    The rough-in was already set to the issued layout four days earlier.Site photo, 3 JulDaily log, 3 Jul
  3. 3
    Casework slipped five working days; nothing else on the path moved.Schedule update 14Daily logs, 8 to 15 Jul
  4. 4
    Written notice went out on day 7 of the 10-day window.Letter, 15 JulClause C6.11

See every project at once.

Open changes, exposure and overdue items for every job you are running, on one screen, ranked by what is at risk. Click any project to open it. No more asking each PM and stitching the answers into a spreadsheet.

PortfolioChange exposure across every job, as at Wed 15 Jul 2026
30dQTDYTD
Portfolio exposure$2.19M5 jobs, 22 changes
Of contract value2.3%of $93.9M contracted
Awaiting a decision$596.1k6 changes in review
Notices inside a week62 already overdue
Schedule claimed23dacross 4 jobs
Exposure by jobChange value not yet closed out
Exposure%ShareNotice
Recreation campus6 changes, 1 in review, 1 drafted$449.3k1.4%2 due
Transit garage expansion6 changes, 2 in review, 1 drafted$680.3k2.8%1 overdue
Riverbend school addition3 changes, 1 in review$246.2k1.9%Clear
Water treatment upgrade4 changes, 1 in review, 1 drafted$653.8k3.6%1 overdue
Civic library retrofit3 changes, 1 in review, 1 drafted$159.7k2.3%1 due
Portfolio$2.19M2.3%
Notice watchClause C6.11, 7 business days
Entitlement expiring$508.0k6 changes inside 7 days, 1 not yet priced
CE-021 Transit garage expansionWash bay drainage regrade$131.6k-3d
CE-035 Water treatment upgradeRaw water main tie-in resequencing$184.6k-1d
CE-006 Recreation campusShower compartment shift1d
CE-005 Recreation campusEquipment-storage opening enlargement$58.0k2d
CE-022 Transit garage expansionOverhead door header revision$62.5k5d
and 5 more with notice windows still open

Put people where the risk is.

Change activity is tracked by project, week over week, so you can see one site heating up while the others are quiet and move your senior people before the problem lands.

Crew assignmentExport XLSX
Crew
July 2026August 2026September 2026
06 Jul13 Jul20 Jul27 Jul03 Aug10 Aug17 Aug24 Aug31 Aug07 Sep14 Sep21 Sep
Piling Crew AM. Quintero
RecreationWater plantRecreation
Earthworks Crew AD. Arsenault
Water plantRiverbendWater plant
Formwork Crew BY. Bahri
RecreationTransit garageRiverbendRecreation
Rebar Crew AI. Prokopiv
RecreationTransit garageRiverbend
Concrete Crew AR. Beaulieu
Transit garageRecreationRiverbendLibrary
Steel Crew AN. Osei
Transit garageLibrary
Mechanical Crew AC. Wapass
RecreationLibraryTransit garage
Electrical Crew AP. Raghunath
LibraryRiverbendTransit garageLibrary

The same day, by role.

Executive

How exposed are we, across all our jobs?

Today

Ask each PM. Wait. Stitch the answers into a spreadsheet.

With Pillarix

One portfolio view: open changes, exposure and overdue items on every project, live.

Operations lead

Two jobs are heating up at once and you have one senior PM.

Today

Find out which one is in trouble after it is.

With Pillarix

See which projects are accumulating change and move people before the problem lands.

Project manager

The owner changes the millwork the morning of the pour.

Today

Find out three days later from a text.

With Pillarix

The change is flagged the moment it appears, with the source attached and the paper trail started.

Site team

The plumber finds the rough-in on the wrong wall.

Today

A text to the PM that nobody files.

With Pillarix

Walk & Talk records it, tagged to the location, and it joins the project record.

See Pillarix on your own project.