$31.3Bof rework a year on US sites, caused by poor communication and bad project dataFMI / PlanGrid, Construction Disconnected
4 hrsper person per week spent dealing with mistakes and reworkFMI / PlanGrid, Construction Disconnected
48%of all rework traced to poor data and miscommunicationFMI / PlanGrid, Construction Disconnected

Capture the change the day it happens.

The foreman says what changed into the phone, the hours go into Timesheets by worker and cost code, and the photo and delivery slip attach themselves. Pillarix turns all of it into a documented change, tagged to the location, before the crew has left site.

Walk & Talk in the Field Agent App: a voice memo transcribed and pinned to room C138 on the drawing
Timesheets on a phone: a day logged as eight hours stood down, with the reason for the standby
Delivery on a phone: a packing slip checked against the purchase order, with a shortage flagged

Proof that gets you paid.

When payment is held on a disputed change order, the record already has the instruction, who gave it, the date, the hours and materials, and the photos. Package it for the GC or owner in one click.

OBS-0918 · ChangeCapture
Site photo: two capped copper supply stubs and a drain rough-in on a boarded wall, with pencil layout marksOBS-091810:12
Voice noteRequired
0:41

“Sink rough-in at Play/Nap 8 is on the north wall. Drawing has it on the millwork return. Plumber says that’s what he was given.”

Auto-filled, confirm or correct
LocationC138 · Pre-School Rm Play/Nap 8 · Level 1auto
Drawing refA-201 · Level 1 floor plan · Rev 3ai
TradePlumbing / millworkai
Submitted byD. Krahn · Site Superintendentauto
PipelineAgent run

Classified

Change eventHighConfidence 0.85
Next stepDraft CE-011 against the 7 Jul instruction and start the C6.11 notice clock
Responsible partyContractor
Sources checkedDrawing reviewContract check

Template engine

change event form
Change event draftMatched to the project change registerTemplate matched
ReferenceCE-011 (auto-assigned)auto
InstructionOwner email, 7 Jul: proceed with the sink as movedai
Evidence1 photo · transcript · A-201 Rev 3 · GPSauto
Notice clauseC6.11 · 10 business days from 7 Julai
CostAwaiting your inputyou
3

Routed for confirmation

PMProject ManagerB. Fu · confirms the draftPrimary
CAContract AdministratorR. Iwasaki · owner sideCopy
Send change event to routeEdit before send

Never miss a notice window.

Most change orders are lost because the notice went out late or not at all. Pillarix tracks the window from the day the change is logged, reminds you before it closes, and drafts the notice letter from your contract and your record for you to review and send.

Sample Project › Smart DraftingHistory 18+ New
Concrete pour delay — freezing rain
Section 32.2(m) — Mitigation of DelaysContract

Outlines the obligation to mitigate delays, relevant given the partial cold-weather protection.

View in file✓ Accept✕ Reject
I have a few questions to nail down the letter:
Answers to your questions1. Delay consumed float only — formally reserve the right to an extension of time.
2. Acknowledge the partial cold-weather protection and note all reasonable efforts were made.
Generate letter now
Version v1AppendixSources 3Export ▾
July 2, 2026Choose receiver

Dear Recipient Name,

Re: Notice of Delay Event — Concrete Pouring Stoppage Due to Freezing Rain

From April 3 to April 5, 2026, the Project Entity was unable to perform scheduled concrete pouring operations.1 This stoppage was caused by freezing rain across three consecutive days.2

Under Section 32.2.a of the Project Agreement, the Project Entity must provide written notice within five Business Days.3

The Project Entity formally reserves its right to claim an extension of time should subsequent schedule developments impact the critical path.4

See every job you are on at once.

Crews on four sites for three different GCs. One screen shows every job by GC and site, open change orders and unpaid amounts ranked by value, and hours by job so you know which contract is eating your week.

PortfolioChange exposure across every job, as at Wed 15 Jul 2026
30dQTDYTD
Portfolio exposure$2.19M5 jobs, 22 changes
Of contract value2.3%of $93.9M contracted
Awaiting a decision$596.1k6 changes in review
Notices inside a week62 already overdue
Schedule claimed23dacross 4 jobs
Exposure by jobChange value not yet closed out
Exposure%ShareNotice
Recreation campus6 changes, 1 in review, 1 drafted$449.3k1.4%2 due
Transit garage expansion6 changes, 2 in review, 1 drafted$680.3k2.8%1 overdue
Riverbend school addition3 changes, 1 in review$246.2k1.9%Clear
Water treatment upgrade4 changes, 1 in review, 1 drafted$653.8k3.6%1 overdue
Civic library retrofit3 changes, 1 in review, 1 drafted$159.7k2.3%1 due
Portfolio$2.19M2.3%
Notice watchClause C6.11, 7 business days
Entitlement expiring$508.0k6 changes inside 7 days, 1 not yet priced
CE-021 Transit garage expansionWash bay drainage regrade$131.6k-3d
CE-035 Water treatment upgradeRaw water main tie-in resequencing$184.6k-1d
CE-006 Recreation campusShower compartment shift1d
CE-005 Recreation campusEquipment-storage opening enlargement$58.0k2d
CE-022 Transit garage expansionOverhead door header revision$62.5k5d
and 5 more with notice windows still open

The same day, by role.

Owner-operator

Payment is held on a disputed change order.

Today

Argue from texts and photos.

With Pillarix

A record with dates, hours and instructions, ready to send.

Project manager

A verbal instruction becomes a change.

Today

Write the notice from memory, late.

With Pillarix

The change is logged with its notice date, and the letter is drafted from the record.

Foreman

The GC asks the crew to redo a wall.

Today

Do it, mention it Friday.

With Pillarix

Walk & Talk logs the instruction, Timesheets log the hours, both land in the record.

See Pillarix on your own project.