The change management platform for construction

Every project changes. Pillarix turns every change order, RFI, and variation into a fast, defensible decision.

Change is where the margin is won or lost.

A differing condition, a revised drawing, or a late instruction each moves cost and schedule. Handled slowly, or without a clear record, that change becomes margin you never get back.

$177Bwasted each year on rework, hunting for project data, and resolving conflictFMI / PlanGrid, 2018 · US
$95Bin sums disputed across global construction projects in a single yearHKA CRUX Insight, 2025
44%of construction projects finish in a net lossAkanbi et al., J. Building Engineering, 2019

Pillarix protects your margin by automating change management end to end.

Nucleus pulls your project data out of its silos and carries each change from first scope to a filed, defensible record, bringing you in only when a call needs your authority.

Review & approvalYou step in only when a call needs your authority
Pillarix platform
ScopeScope Analysis
ImpactCost Impact
ApproveChange Mgmt
DefendSmart Drafting
RecordDocument Control
Siloed project data
SharePoint
Procore
Email
Asite
MS Project
Ask Nucleus

Now you can just ask.

Ask about any change order, RFI, or variation in plain language. Nucleus reads across every silo, plans the answer, checks the details with you, then sets the Pillarix agents to work.

  • Reads across every connected system
  • Shows its plan before it acts
  • One cited answer, from every agent
NucleusYour project’s brain

“Is the revised Level 02 cladding detail a variation, or already in our scope?”

Reading across every silo · 1,696 documents
SharePointProcoreOutlookDrawings
Forming a plan
  1. Check the revised detail against the contract scope
  2. Compare the drawing revisions for what changed
  3. Draft the response, cited to source
01Scope

Pinpoint what changed, and why.

Pillarix reads every drawing, RFI, specification, and email on the project, then classifies each comment as in-scope, out-of-scope, or ambiguous — with the clause that decides it.

  • Grounded in your contract
  • Clause-level citations
scope-analysis
CommentStatusClause
#1024Platform lighting enhancement
In ScopeSC 4.1
#1087Baseline topography re-survey
Out of ScopeSC 4.7.2
#1103Drainage design clarification
AmbiguousSC 13.1
#1156Structural load verification
In ScopeSC 7.2
#1201Additional noise assessment
Out of ScopeSC 4.7.2
#1290Fire suppression upgrade
In ScopeSC 5.3
02Impact

Quantify the cost and the schedule.

Before a change is committed, Pillarix estimates its cost and time effect and ties the number back to the drawings, quantities, and rates behind it.

  • Cost and schedule together
  • Every figure traceable
cost-impact
Change CO-142Priced
Cost
+C$48,200
Schedule
+6 days
Traced to 3 drawings · 12 takeoff line items
03Approve

Decide it, and route it.

The Change Management agent recommends in-scope or out with the reasoning to back it, then routes the decision to the right person for sign-off.

  • Recommendation with rationale
  • Routed for approval
Document Q&AClause SearchRisk Analysis

Is Comment #2847 enforceable under the current contract?

Comment #2847 appears to be Out of Scope.

The contractor is only responsible for verification of client-provided data within 28 days of the Commencement Date. This comment was issued on Day 142 and requests a re-verification of the baseline topography.

Sub-Clause 4.7.2Appendix B
Ask a question about your contracts...
04Defend

Draft a response that holds up in court.

The Smart Drafting agent turns the decision into formal correspondence, grounded in the contract, prior letters, and the project record, so your position is defensible if the change is ever contested.

  • Contract-grounded language
  • Cited to the record
correspondence-drafter
Referenced clauses
SC 1.5SC 3.5SC 13.1SC 12.3
Document typeReservation of Rights
SC 13.1
SC 12.3
05Record

File every change where it belongs.

The Document Control agent files each transmittal, revision, and approval with the right number and status code, so nothing leaves the system and the register always shows the truth.

  • Revision & status control
  • Reconciled with SharePoint
document-register
PLX-ARC-XX-00-DR-A-2001Level 00 · General ArrangementRev P04 · Architectural
S2 For information
PLX-STR-XX-01-DR-S-3100Level 01 · Steel Framing PlanRev C01 · Structural
A1 For construction
See it in action

See a change handled in minutes, not weeks.

Watch Pillarix agents take a change from the first signal to a defensible record.

Measurable impact

Proven on live projects.

more changes and correspondence handled per project manager
90%+accuracy classifying in-scope vs. out-of-scope, against ~70% by hand
Hoursto scope a change that used to take weeks
From a 500-comment scope analysis
~90% faster than manual reviewC$30K+ saved vs. an external consultantC$5K+ saved vs. an internal team
Trust & security

Trusted with your project data.

Pillarix is built for enterprise data governance. Every workflow runs on a foundation of independent compliance attestations.

SOC 2 Type 2

SOC 2 Type 2

Pillarix holds AICPA SOC 2 Type 2 attestation covering Security, Availability, and Confidentiality.

GDPR

GDPR compliant

Pillarix meets the requirements of the EU General Data Protection Regulation for personal data handled across the platform.

Stop leaving value on the table.

Let Pillarix turn every change order, RFI, and variation into a fast, defensible decision.

Request Demo →