Every change handled, from the first signal to a signed record.

Pillarix connects to the systems you already use, reads your drawings and contracts, and tracks every change until it is signed off.

PillarixAsk Nucleus about this project…⌘KA. SandhuAS
Sample Project DashboardAgent LibraryKnowledge & DocumentsField ObservationsLearning Paths
All projects Sample Project
Sample ProjectProject Settings
Operations dashboardToday7d30dQTDYTD
Pending actions2
Hours saved (est.)312hrs
Margin protected (est.)$1.2M
Email agent[email protected]Forward a mail here, or CC this address on a thread, and Pillarix tracks it.
Needs you 2ActivitySearch
CE-011 Sink relocation at Play/Nap 8 An owner instruction on 7 July moved the sink to the north wall with no drawing reissued. The rough-in was already set to the issued layout, so the millwork return has to be reworked.
8 days ago
StatusDraftCostUnpricedSchedule5 daysNotice1 day, C6.11OwnerUnassigned
Next stepWritten notice under C6.11 is required before Thursday to preserve entitlement. A letter citing C7.1 and the 3 Jul site photo is drafted and ready to serve.
Ask NucleusReview draft
Assign… HoldDismiss
CE-006 Shower compartment shift and drain coordination Draft change from the 7 Jul site walk. Notice under C6.11 due tomorrow; no owner assigned.
8 days ago

Catch the change the moment it happens.

Site teams record a voice memo. Owners send an email. Documents arrive from SharePoint or Procore. Pillarix reads each one and records the change, with no form to fill in.

Walk & Talk in the Field Agent App: a voice memo transcribed and pinned to room C138 on the drawing

Get the case built in minutes.

Pillarix drafts the change event for you: what changed, where, who asked for it and when notice is due. The Drawing Board shows where on the project changes are building up.

Dana WhitfieldOwner’s representative
RE: Sta. 42+00, unsuitable material, direction to proceed

Further to our site meeting of 26 August, please proceed with excavation and off-site disposal of the affected material at Sta. 42+00 to 48+50. The Owner considers this within the existing scope of work. Confirm your programme impact within 5 business days.

Site meeting minutes, 26 Aug.pdfGeotech log BH-14.pdfPhoto log 42+00.zip
Impact
$4.2M8,400 t × $312/t, rate from BH-14 p.4Show evidence
+18 days650 m at planned output, response due 4 SepShow evidence
In 4 daysTime-barred under GC 8.2, 10 business days from 26 AugShow evidence
Route toScope Analysis

A written direction asserting the work is in scope. Scope Analysis tests it against the contract and the geotechnical baseline, and already holds an open claim on this chainage.

ArchiveRun Scope Analysis

Decide fast, with the facts in front of you.

Open changes are ranked by cost exposure and notice deadline, each with an owner and a drafted next step. You approve, edit or reject before anything is sent.

Queue$99,920.64 undecided, as at 15 Jul 2026
ArrivalExposure
#ItemExposureNoticeOwner
13CE-011DraftPre-school room millwork and sink relocation at Play/Nap 8–5 days1 dayC6.11Unassigned8 days

An owner instruction on 7 July moved the sink at Play/Nap 8 to the north wall with no drawing reissued. A site capture from 3 July shows the rough-in already set to the issued layout, so the millwork return has to be reworked. Written notice under C6.11 falls due on 16 July.

CostUnpricedSchedule5 days Close date16 Jul 2026
Chronology
  1. 2026-07-03 Dale Krahn (Site Superintendent)Millwork rough-in photographed at Play/Nap 8
  2. 2026-07-06 Amrit Sandhu (Project Engineer)Fixture heights queried against the coordinated layout
  3. 2026-07-07 Ruth Iwasaki (Contract Administrator)Email: proceed with the sink as moved, no drawing to be reissued
  4. 2026-07-07 Change analyst (Agent)Photograph and email disagree with the issued layout
  5. 2026-07-07 Change analyst (Agent)Change drafted, clause C7.1 cited, notice clock started
Next step

Written notice under C6.11 is required before Thursday to preserve entitlement. A letter citing C7.1 and the 03 Jul capture is drafted and ready to serve.

Ask NucleusReview draft
DismissHoldAssign
23CE-006DraftShower compartment shift and drain coordination–1 dayC6.11Unassigned8 days

Walk into any dispute with the record already built.

Every finding links back to the email, photo or drawing it came from. If a claim comes, the Pillarix team helps you turn that record into a claim file.

Claim fileCE-011 Sink relocation at Play/Nap 8
29 Jun6 Jul13 Jul20 Jul
Millwork, Play/Nap 8
Plumbing rough-in
Casework install
PhotoInstructionNotice
PlannedAs builtDelay claimed
  1. 1
    The owner moved the sink to the north wall on 7 July without reissuing the drawing.Email, R. Iwasaki, 7 JulA-201 Rev 3
  2. 2
    The rough-in was already set to the issued layout four days earlier.Site photo, 3 JulDaily log, 3 Jul
  3. 3
    Casework slipped five working days; nothing else on the path moved.Schedule update 14Daily logs, 8 to 15 Jul
  4. 4
    Written notice went out on day 7 of the 10-day window.Letter, 15 JulClause C6.11

Works with the tools you already use.

Built to protect a sensitive project record.

Each customer runs in their own tenancy, hosted in Canada by default. Access is by role and every action is logged.

  • Your own isolated tenancy, hosted in Canada by default
  • Your data is encrypted in transit and at rest
  • Your data is never used to train models without your consent
SOC 2 Type 2GDPR aligned

See Pillarix on your own project.