Every change handled, from the first signal to a signed record.
Pillarix connects to the systems you already use, reads your drawings and contracts, and tracks every change until it is signed off.
Catch the change the moment it happens.
Site teams record a voice memo. Owners send an email. Documents arrive from SharePoint or Procore. Pillarix reads each one and records the change, with no form to fill in.
Forward a mail here, or copy this address on a thread, and Pillarix reads it into the record.

Get the case built in minutes.
Pillarix drafts the change event for you: what changed, where, who asked for it and when notice is due. The Drawing Board shows where on the project changes are building up.
Further to our site meeting of 26 August, please proceed with excavation and off-site disposal of the affected material at Sta. 42+00 to 48+50. The Owner considers this within the existing scope of work. Confirm your programme impact within 5 business days.
A written direction asserting the work is in scope. Scope Analysis tests it against the contract and the geotechnical baseline, and already holds an open claim on this chainage.
Decide fast, with the facts in front of you.
Open changes are ranked by cost exposure and notice deadline, each with an owner and a drafted next step. You approve, edit or reject before anything is sent.
An owner instruction on 7 July moved the sink at Play/Nap 8 to the north wall with no drawing reissued. A site capture from 3 July shows the rough-in already set to the issued layout, so the millwork return has to be reworked. Written notice under C6.11 falls due on 16 July.
- 2026-07-03 Dale Krahn (Site Superintendent)Millwork rough-in photographed at Play/Nap 8
- 2026-07-06 Amrit Sandhu (Project Engineer)Fixture heights queried against the coordinated layout
- 2026-07-07 Ruth Iwasaki (Contract Administrator)Email: proceed with the sink as moved, no drawing to be reissued
- 2026-07-07 Change analyst (Agent)Photograph and email disagree with the issued layout
- 2026-07-07 Change analyst (Agent)Change drafted, clause C7.1 cited, notice clock started
Written notice under C6.11 is required before Thursday to preserve entitlement. A letter citing C7.1 and the 03 Jul capture is drafted and ready to serve.
Walk into any dispute with the record already built.
Every finding links back to the email, photo or drawing it came from. If a claim comes, the Pillarix team helps you turn that record into a claim file.
- 1The owner moved the sink to the north wall on 7 July without reissuing the drawing.Email, R. Iwasaki, 7 JulA-201 Rev 3
- 2The rough-in was already set to the issued layout four days earlier.Site photo, 3 JulDaily log, 3 Jul
- 3Casework slipped five working days; nothing else on the path moved.Schedule update 14Daily logs, 8 to 15 Jul
- 4Written notice went out on day 7 of the 10-day window.Letter, 15 JulClause C6.11
Works with the tools you already use.
Built to protect a sensitive project record.
Each customer runs in their own tenancy, hosted in Canada by default. Access is by role and every action is logged.
- Your own isolated tenancy, hosted in Canada by default
- Your data is encrypted in transit and at rest
- Your data is never used to train models without your consent