Know what is happening on every project you fund.

80%over budget is where the average large project landsMcKinsey, Imagining construction's digital future
$60.1Maverage value of a North American construction dispute in 2024Arcadis Global Construction Disputes Report, 2025
12.5 monthsaverage time to resolve oneArcadis Global Construction Disputes Report, 2025

See what is really happening, on every project.

Progress, open changes and pending responses for every project in your program, on one screen, updated as the site moves. Click through from the program to a project to the document behind it.

PortfolioChange exposure across every job, as at Wed 15 Jul 2026
30dQTDYTD
Portfolio exposure$2.19M5 jobs, 22 changes
Of contract value2.3%of $93.9M contracted
Awaiting a decision$596.1k6 changes in review
Notices inside a week62 already overdue
Schedule claimed23dacross 4 jobs
Exposure by jobChange value not yet closed out
Exposure%ShareNotice
Recreation campus6 changes, 1 in review, 1 drafted$449.3k1.4%2 due
Transit garage expansion6 changes, 2 in review, 1 drafted$680.3k2.8%1 overdue
Riverbend school addition3 changes, 1 in review$246.2k1.9%Clear
Water treatment upgrade4 changes, 1 in review, 1 drafted$653.8k3.6%1 overdue
Civic library retrofit3 changes, 1 in review, 1 drafted$159.7k2.3%1 due
Portfolio$2.19M2.3%
Notice watchClause C6.11, 7 business days
Entitlement expiring$508.0k6 changes inside 7 days, 1 not yet priced
CE-021 Transit garage expansionWash bay drainage regrade$131.6k-3d
CE-035 Water treatment upgradeRaw water main tie-in resequencing$184.6k-1d
CE-006 Recreation campusShower compartment shift1d
CE-005 Recreation campusEquipment-storage opening enlargement$58.0k2d
CE-022 Transit garage expansionOverhead door header revision$62.5k5d
and 5 more with notice windows still open

Know what might go wrong before it does.

Pillarix reads contractor notices and correspondence as they arrive and flags the early signs while there is still time to act: change activity climbing on one contract, responses running late, deadlines approaching.

Dana WhitfieldOwner’s representative
RE: Sta. 42+00, unsuitable material, direction to proceed

Further to our site meeting of 26 August, please proceed with excavation and off-site disposal of the affected material at Sta. 42+00 to 48+50. The Owner considers this within the existing scope of work. Confirm your programme impact within 5 business days.

Site meeting minutes, 26 Aug.pdfGeotech log BH-14.pdfPhoto log 42+00.zip
Impact
$4.2M8,400 t × $312/t, rate from BH-14 p.4Show evidence
+18 days650 m at planned output, response due 4 SepShow evidence
In 4 daysTime-barred under GC 8.2, 10 business days from 26 AugShow evidence
Route toScope Analysis

A written direction asserting the work is in scope. Scope Analysis tests it against the contract and the geotechnical baseline, and already holds an open claim on this chainage.

ArchiveRun Scope Analysis

Every decision traceable to who made it, and why.

Instructions, approvals and responses are logged with author, date and the document they relied on. When your board asks who knew what and when, the answer is already in the record.

Queue$99,920.64 undecided, as at 15 Jul 2026
ArrivalExposure
#ItemExposureNoticeOwner
13CE-011DraftPre-school room millwork and sink relocation at Play/Nap 85 days1 dayC6.11Unassigned8 days

An owner instruction on 7 July moved the sink at Play/Nap 8 to the north wall with no drawing reissued. A site capture from 3 July shows the rough-in already set to the issued layout, so the millwork return has to be reworked. Written notice under C6.11 falls due on 16 July.

CostUnpricedSchedule5 days Close date16 Jul 2026
Chronology
  1. 2026-07-03 Dale Krahn (Site Superintendent)Millwork rough-in photographed at Play/Nap 8
  2. 2026-07-06 Amrit Sandhu (Project Engineer)Fixture heights queried against the coordinated layout
  3. 2026-07-07 Ruth Iwasaki (Contract Administrator)Email: proceed with the sink as moved, no drawing to be reissued
  4. 2026-07-07 Change analyst (Agent)Photograph and email disagree with the issued layout
  5. 2026-07-07 Change analyst (Agent)Change drafted, clause C7.1 cited, notice clock started
Next step

Written notice under C6.11 is required before Thursday to preserve entitlement. A letter citing C7.1 and the 03 Jul capture is drafted and ready to serve.

Ask NucleusReview draft
DismissHoldAssign
23CE-006DraftShower compartment shift and drain coordination1 dayC6.11Unassigned8 days

One record for owner, contractor and consultants.

Owner, contractor and consultants work from the same record, with changes pinned to drawings and locations everyone recognises. Fewer arguments about what was said, and if a dispute comes anyway, the Pillarix team helps you build the claim file from that record.

Claim fileCE-011 Sink relocation at Play/Nap 8
29 Jun6 Jul13 Jul20 Jul
Millwork, Play/Nap 8
Plumbing rough-in
Casework install
PhotoInstructionNotice
PlannedAs builtDelay claimed
  1. 1
    The owner moved the sink to the north wall on 7 July without reissuing the drawing.Email, R. Iwasaki, 7 JulA-201 Rev 3
  2. 2
    The rough-in was already set to the issued layout four days earlier.Site photo, 3 JulDaily log, 3 Jul
  3. 3
    Casework slipped five working days; nothing else on the path moved.Schedule update 14Daily logs, 8 to 15 Jul
  4. 4
    Written notice went out on day 7 of the 10-day window.Letter, 15 JulClause C6.11

The same day, by role.

Program director

Exposure across the programme.

Today

Monthly reports, already out of date.

With Pillarix

Program view of open exposure and notice watch, live.

Project manager

A contractor claims a differing site condition.

Today

Reconstruct who knew what, and when.

With Pillarix

The change event shows the source, the drawing revision and the notice date.

Site representative

Something on site does not match the drawing.

Today

A line in a daily report.

With Pillarix

Field capture that later supports or rebuts the claim.

Commercial manager

A claim lands on a finished project.

Today

External consultants, months of work.

With Pillarix

Claim file rebuilt with the Pillarix team, every conclusion sourced.

See Pillarix on your own project.